KENNEDY SPACE CENTER SHUTTLE & PAYLOAD PROCESSING STATUS REPORT Friday, Oct. 5, 2001 (2 p.m.) NOTE: This is an orbiter processing report and does not necessarily reflect the chronological order of upcoming Space Shuttle flights. Visit http://www-pao.ksc.nasa.gov/kscpao/schedule/schedule.htm on the KSC Home Page for the latest schedule of future Shuttle missions. MISSION: STS-108 - 12th ISS Flight (UF1) - MPLM VEHICLE: Endeavour/OV-105 TARGET KSC LAUNCH DATE/TIME: Nov. 29, 2001 at 7:35 p.m. EST TARGET KSC LANDING DATE/TIME: Dec. 10, 2001 MISSION DURATION: 11 days CREW: Gorie, Kelly, Godwin, Tani; (ISS up) Onufrienko, Bursch, Walz; (ISS down) Culbertson, Dezhurov, Tyurin ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees Shuttle Processing Note: After a thorough engineering evaluation, Space Shuttle managers determined today that orbiter Endeavour is safe to fly without any additional orbiter maneuvering system (OMS) pod work. Testing and analysis confirmed that the strength of the OMS pod attach point will not be compromised by irregular bolt holes, even if the deformation is greater than that seen on orbiter Columbia. Main engine heat shield installation continues along with the monoball wiring harness modification. Workers have completed auxiliary power unit (APU) No. 2 reconnects. Functional testing of the orbiter/external tank door begins later today. MISSION: STS-109 - HST Servicing Mission 3B VEHICLE: Columbia/OV-102 TARGET KSC LAUNCH DATE/TIME: Feb. 14, 2002 at 1:43 p.m. EST TARGET KSC LANDING DATE/TIME: Feb. 25, 2002 at 11:40 a.m. MISSION DURATION: 11 days CREW: Altman, Carey, Grunsfeld, Currie, Newman, Linnehan, Massimino ORBITAL INSERTION ALTITUDE and INCLINATION: 308 nautical miles/28.5 degrees Shuttle Processing Note: Columbia's payload premate test is in work today. Workers are checking Columbia's S-band communication system and conducting the interface verification test for the orbiter's forward steering system. MISSION: STS-110 - 13th ISS Flight (8A) - ITS S0, MT VEHICLE: Atlantis/OV-104 TARGET KSC LAUNCH DATE/TIME: March 21, 2002 TARGET KSC LANDING DATE/TIME: March 30, 2002 MISSION DURATION: 11 days CREW: Bloomfield, Frick, Ross, Smith, Ochoa, Morin, Walheim ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees Shuttle Processing Note: Technicians have completed routine X-ray checks following the recent OMS/RCS thruster replacement. Later today, workers will drain Atlantis' auxiliary power unit fuel system. The monoball wiring harness modification continues. STRUCTURAL INSPECTION & MODIFICATION PERIOD VEHICLE: Discovery/OV-103 Shuttle Processing Note: Orbiter Discovery remains in temporary storage through late October. Discovery is scheduled to begin a thorough structural inspection and modification period. Shuttle managers continue to assess the content, schedule and location of this planned work period. -- end --