KENNEDY SPACE CENTER SHUTTLE & PAYLOAD PROCESSING STATUS REPORT Tuesday, Nov. 13, 2001 (11 a.m.) NOTE: This is an orbiter processing report and does not necessarily reflect the chronological order of upcoming Space Shuttle flights. Visit http://www-pao.ksc.nasa.gov/kscpao/schedule/schedule.htm on the KSC Home Page for the latest schedule of future Shuttle missions. MISSION: STS-108 - 12th ISS Flight (UF1) - MPLM VEHICLE: Endeavour/OV-105 TARGET KSC LAUNCH DATE/TIME: Nov. 29, 2001 at 7:44 p.m. TARGET KSC LANDING DATE/TIME: Dec. 10, 2001 at 3:41 p.m. MISSION DURATION: 10 days, 20 hours CREW: Gorie, Kelly, Godwin, Tani; (ISS up) Onufrienko, Bursch, Walz; (ISS down) Culbertson, Dezhurov, Tyurin ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees Shuttle Processing Note: Processing continues on schedule for the launch of STS-108 on Nov. 29. At Pad B, hypergolic propellant loading of Shuttle Endeavour is in progress. The replacement yaw actuator for engine No. 2 was installed over the weekend and will undergo verification testing later this week. The STS-108 Flight Readiness Review will take place Thursday at KSC. MISSION: STS-109 - HST Servicing Mission 3B VEHICLE: Columbia/OV-102 TARGET KSC LAUNCH DATE: Feb. 14, 2002 TARGET KSC LANDING DATE: Feb. 25, 2002 MISSION DURATION: 11 days CREW: Altman, Carey, Grunsfeld, Currie, Newman, Linnehan, Massimino ORBITAL INSERTION ALTITUDE and INCLINATION: 308 nautical miles/28.5 degrees Shuttle Processing Note: In the Orbiter Processing Facility (OPF), Columbia's main engines have been installed. Engine leak checks and potable water servicing are in work. MISSION: STS-110 - 13th ISS Flight (8A) - ITS S0, MT VEHICLE: Atlantis/OV-104 TARGET KSC LAUNCH DATE: March 21, 2002 TARGET KSC LANDING DATE: April 1, 2002 MISSION DURATION: 11 days CREW: Bloomfield, Frick, Ross, Smith, Ochoa, Morin, Walheim ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees Shuttle Processing Note: Orbiter Atlantis remains powered down in the OPF as scheduled modification work continues through mid-December. STRUCTURAL INSPECTION & MODIFICATION PERIOD VEHICLE: Discovery/OV-103 Shuttle Processing Note: Discovery is in the OPF awaiting a decision by Shuttle managers on the content, schedule and location of the structural inspection and modification down period. Deservicing operations continue, with preparations underway to remove the left and right Orbiter Maneuvering System (OMS) pods -- end --