KENNEDY SPACE CENTER SHUTTLE & PAYLOAD PROCESSING STATUS REPORT Monday, Feb. 11, 2002 (2:00 p.m.) NOTE: This is an orbiter processing report and does not necessarily reflect the chronological order of upcoming Space Shuttle flights. Visit http://www-pa o.ksc.nasa.gov/kscpao/schedule/schedule.htm on the KSC Home Page for the latest schedule of future Shuttle missions. MISSION: STS-109 Ð HST Servicing Mission 3B VEHICLE: Columbia/OV-102 TARGET KSC LAUNCH DATE: Feb. 28, 2002 at 6:48 a.m. TARGET KSC LANDING DATE: ÊMarch 11, 2002 at 3:33 a.m. MISSION DURATION: 11 days CREW: Altman, Carey, Grunsfeld, Currie, Newman, Linnehan, Massimino ORBITAL INSERTION ALTITUDE and INCLINATION: 308 nautical miles/28.5 degrees Shuttle Processing Note: Shuttle Columbia remains on schedule for the planned liftoff of the Hubble Servicing Mission at 6:48 a.m. EST on Feb. 28. At Pad A, hypergolic oxidizer loading is in progress and is expected to be completed late tonight. The operation was rescheduled due to the failure of a poppet in a second Fill and Drain Quick Disconnect (QD) during servicing last Friday. The launch team opted to complete hypergolic fueling on Saturday and make the QD repairs before resuming the oxidizer fill. The Auxiliary Propulsion Unit (APU) hot fire is scheduled for tomorrow after the Rotating Service Structure (RSS) is moved to the parked position. The Hubble payload will be transferred to the pad early Wednesday and will be installed onboard Columbia late this week. MISSION: STS-110 Ð 13th ISS Flight (8A) Ð ITS SO TRUSS AND MOBILE TRANSPORTER VEHICLE: Atlantis/OV-104 TARGET KSC LAUNCH DATE: April 4, 2002 TARGET KSC LANDING DATE: April 15, 2002 MISSION DURATION: 11 days CREW: Bloomfield, Frick, Ross, Smith, Ochoa, Morin, Walheim ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees Shuttle Processing Note: In the Orbiter Processing Facility (OPF) high bay, work on Shuttle Atlantis continues to complete re-alignment of 14 boltholes in Orbiter Maneuvering System (OMS) attach point No. 5 before the OMS pod is installed. Heat shield installation is in work and servicing of the APU water spray boiler is complete. MISSION: STS-111 Ð 14th ISS flight (UF2) Ð MPLM VEHICLE: Endeavour/OV-105 TARGET LAUNCH DATE: May 2, 2002 TARGET KSC LANDING DATE: ÊMay 13, 2002 CREW: Cockrell, Lockhart, Chang-Diaz, Perrin; (ISS up) Korzun, Whitson, Treschev; (ISS down) Onufrienko, Bursch, Walz ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees Shuttle Processing Note: Shuttle Endeavour is undergoing pre-launch processing in the OPF. Preparations for the Payload Premate Test and Power Reactant Storage and Distribution (PRSD) checkout are in progress. ORBITER MAINTENANCE AND MODIFICATION PERIOD VEHICLE: Discovery/OV-103 Shuttle Processing Note: Discovery is in the OPF awaiting the start of its Orbiter Maintenance and Modification (OMM) period at the Kennedy Space Center that is scheduled to begin late this summer. -- end -